House of Dancing Water

Credits

Featured Credit

House of Dancing Water

Melco Resorts & Entertainment • City of Dreams, Macau • 2024–2025

An icon reimagined.

One of the world's most iconic water-based theatrical productions, remounted at its original home in Macau. OLC was entrusted by Melco Resorts & Entertainment to lead the return of House of Dancing Water at City of Dreams; a reflection of our team's expertise in delivering large-scale, technically complex entertainment at the highest level.

At a Glance

Venue

Purpose-built 2,000-seat theatre, City of Dreams, Macau

Client

Melco Resorts & Entertainment

Stage

3.7-million-gallon water stage, Fully transformable performance surfaces

Cast

Over 100 world-class acrobats, divers, and performers

The Project

Where Water Defies Gravity

House of Dancing Water is one of the most technically sophisticated resident productions ever staged. Performed within a purpose-built theatre at City of Dreams, Macau, the show is anchored by a 3.7-million-gallon pool that transforms from deep-water dive environment to fully dry stage within moments. Its operation demands precision engineering as much as artistic vision.

The production exists at the intersection of extreme performance and complex infrastructure. High-platform divers, aerial artists, acrobats, and motorcycle riders perform within a constantly shifting environment of water, automation, SFX, hydraulics, and moving architecture. Every cue depends on tightly integrated technical systems functioning in absolute synchronization.

Few productions in the world combine this level of aquatic engineering, automation, and live performance at scale. Remounting it required more than restaging choreography. It required rebuilding an ecosystem.

OLC was engaged to lead the complete remount of this landmark production, restoring not only its visual spectacle but its operational integrity. Our team oversaw creative reassembly, global casting, technical recommissioning, rehearsal strategy, and cross-departmental integration, guiding the production from redevelopment through opening and the handover to the resident operations team.

Scope of Work

  • Full creative development
  • Casting and performer recruitment worldwide
  • Technical production and theatre systems
  • Rehearsal management and show readiness

Highlights

  • Experience: One of Asia's most spectacular entertainment experiences
  • Stage: 3.7-million-gallon water stage with transforming dry/wet surfaces
  • Cast: Cast of world-class acrobats, divers, and performers
  • Technology: Cutting-edge theatrical technology and automation systems